NEPGA Protests ISO-NE Installed Capacity Requirement Proposal

NEPGA filed a Motion to Intervene and Protest in response to ISO-NE’s proposal to reduce the FCA 10 Installed Capacity Requirement by 390 MW based on its forecast of incremental behind the meter solar PV capacity not otherwise captured in the peak load forecast.   NEPGA-Protest_ER16-307.pdf

Posted in Document Archive, Federal Filings, Recent Filings and tagged , .