NEPGA filed Post-Technical Conference Comments in response to FERC’s November 9 Technical Conference regarding the utilization of electric storage resources as transmission assets compensated through transmission rates (No. AD16-25). NEPGA takes the position that FERC should not adopt a rule granting all new energy storage resources transmission rate cost recovery.
![](https://nepga.org/wp-content/plugins/custom-post-type-attachment-pro/images/pdf.png)